Replacement of Bridge No. 04583, Bunker Hill Road over Hop River
Plans
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| 01-General | 2.4 MB | ||
| 02-Revisions | 3.1 MB | ||
| 03-Highway | 8.3 MB | ||
| 04-Structures | 14.8 MB | ||
| CTDOT HIghway Standard Sheets | 4.2 MB | ||
| CTDOT Traffic Standard Sheets | 3.8 MB |

