Rehabilitation of West Wakefield Boulevard over Sucker Brook

The project involves the rehabilitation of two 72-inch culverts approximately 60-feet long with riprap slope protection. The road will remain open to traffic during construction.

Status

Bidding Closed

Prebid Date9/30/20 10:30 am

Bid Date10/7/20 10:00 am

Company & Contacts

Cardinal Engineering Associates, Inc

Gary Giroux gary@cardinal-engineering.com   (203) 238-1969

Location

Winchester, CT

An optional pre-bid meeting with potential bidders will be held at the project site on September 30 at 10:30 AM.
Includes paper & digital set