Entry Stair Reconstruction Rocky Hill High School

The existing main entrance concrete stairs, railings, stair lighting and associated electrical shall be demolished and removed. A new stair configuration consisting of pre-cast concrete and permeable pavers will be constructed. Excavations will be required to form and cast new concrete footings and foundations to support the pre-cast stair components. A drainage system will be provided for the stair landings and main plaza by means of permeable pavers, surface drains and piping run to an existing underground drainage structure. In addition, concrete cutting will be required at existing walls, new masonry block infill, and fabrication and replacement of pre-cast concrete components at masonry walls. New metal railing systems, lighting and landscaping are also required in the project.

Status

Bidding Closed

Prebid Date12/19/19 3:00 pm

Bid Date1/23/20 2:00 pm

Company & Contacts

Kaestle Boos Associates, Inc

Enrico Chiarillo - echiarillo@kba-architects.com   (860) 229-0361

Location

Rocky Hill, CT

Change the following:
DATE OF BID OPENING: January 23, 2020
Change the following:
“All Requests for Information (RFI) are to be emailed to the attention of Enrico Chiarillo at echiarillo@kba-architects.com
RFIs must be received by the Architect by Thursday, January 16 2020 at NOON – Last day to receive RFIs.”

A Non-Mandatory Pre-Bid Meeting will be held on December 19, 2019, at 3:00 PM at the job site at 50 Chapin Avenue, Rocky Hill, CT 06067

Plans and Specs may be ordered in either paper or digital format (pdfs). If you would like both, it is an additional 30.00. Please specify at time of check out.