Torrington Towers Fire Protection

Bids will be received for furnishing all labor, materials, tools, and equipment necessary to construct, equip and finish the above project, in accordance with the documents prepared by Antinozzi Associates, P.C. The Scope of Work includes, but is not limited to upgrades to the fire protection system, and associated work as shown on drawings and specifications.
Addendum 1 (click to expand/collapse)
Name Size
4.1 - BID FORM 104.0 KB
22068 Addendum No. 1 73.6 KB
22679_011123_FP-1 883.6 KB