The Reconstruction of Jerome Avenue - Project No. L020-001

In general the work to be performed under this contract includes the reclamation of 2,150 linear feet and full depth reconstruction of approximately 850 linear feet of Jerome Avenue (including but not limited to the installation of new HMA pavement, base, bituminous curbing, roadway drainage systems, guide rail and other related roadway appurtenances), and the reconstruction of driveway aprons, installation of erosion control measures, topsoil and turf establishment.

Status

Accepting Bids

Bid Date10/18/19 10:00 am

Company & Contacts

WMC Engineers

Robert Barneschi - RBarneschi@WMCENGINEERS.com   860-667-9624

Location

Burlington, CT

Plans and Specs may be ordered in either paper or digital format (pdfs). If you would like both, it is an additional 30.00. Please specify at time of check out.