Demolition of Water Tank

The Work under this contract includes, but is not necessarily limited to, the demolition of the water tank at 208 Wallens Street. The existing concrete pad and foundation that the water tank lies on is to remain after completion of work. The project also includes the remediation of surrounding landscape. The existing water tank structure was painted in 1975 and contains 150,000 mg/kg (ppm) of lead (Refer to Appendix 1 for a copy of the Hazardous Material Report. The contractor is required to submit an Action-Plan which must be in compliance with BPA and OSHA regulations (for additional detail refer to attached Lead Based Paint Work Activities specification). This includes all work for the base bid and bid alternates.

Status

Bidding Closed

Bid Date12/2/22 10:00am

Company & Contacts

Town of Winchester

Mark Douglass (860) 379-4070   bclark@townofwinchester.org

Location

Winchester, CT

Includes paper & digital set